“Maritsa” Motorway

Section Lot 1 “Orizovo-Dimitrovgrad”.

The route has a total length of 31.4 km, gauge A-28 m. Design speed: 120 km/h.

Major facilities: 22.

Within Lot 1, 4 parking lots, 10 overpasses, 3 underpasses, 4 bridges, and 5 agricultural underpasses have been built. Irrigation systems, water pipes, and power lines have been reconstructed.

Централен офис

2709 Бело Поле, община Благоевград

 

Производствена база Грома Холд

Headquarters

2709 Belo Pole, Blagoevgrad Municipality

Production facility “Groma Hold”

© 2024-25