Transit Roads IV – Lot 9

During the implementation of the project, a number of activities were carried out, including:

  • excavation;
  • cutting down trees, branches, and bushes;
  • milling of existing asphalt concrete pavement;
  • dismantling and installation of existing single and double elastic fencing;
  • delivery and laying of dense and non-dense asphalt mix and patching of road pavement;
  • construction of bitumen spill;
  • delivery and laying of material for the base of the shoulders;
  • delivery and laying of concrete curbs;
  • laying of horizontal markings;
  • delivery and laying of Italian gutters;
  • delivery and on-site pouring of concrete;
  • repair and lifting of existing storm drains.