During the implementation of the project, a number of activities were carried out, including:
- excavation;
- cutting down trees, branches, and bushes;
- milling of existing asphalt concrete pavement;
- dismantling and installation of existing single and double elastic fencing;
- delivery and laying of dense and non-dense asphalt mix and patching of road pavement;
- construction of bitumen spill;
- delivery and laying of material for the base of the shoulders;
- delivery and laying of concrete curbs;
- laying of horizontal markings;
- delivery and laying of Italian gutters;
- delivery and on-site pouring of concrete;
- repair and lifting of existing storm drains.