Project for the reconstruction of the playing field at the “Hristo Botev” Stadium in Blagoevgrad, including the following sub-projects:
- design and construction of a drainage system;
- design and implementation of an automated irrigation system;
- design and implementation of a 100 m3 reservoir and pumping station;
- design and implementation of a 1500 m water pipeline to the reservoir;
- turfing with new sod, fertilizers, excavations.